Two domains, one MT3S bundle: Marketing Programs (unchanged) and the
imported Smart Links (smart links + UTM taxonomies), each keeping its
own menu, tables, routes and translations.
- Code moved from MauticPlugin\SmartlinksBundle\ to
MauticPlugin\MT3SMarketingProgramBundle\; template namespace
@Smartlinks/ -> @MT3SMarketingProgram/; smartlinks.js ->
Assets/js/mt3s-mp-smartlinks.js; icon -> Assets/img/smartlinks-icon.svg.
- Incoming migrations renamed Version_0_X_0_SmartLinks.php to avoid
the class-name collision; schema untouched, data intact.
- Permissions folded into MT3SMarketingProgramPermissions:
smart_links + taxonomies under the mt3smarketingprogram: base
(roles that had the old smartlinks: grants must be re-granted).
- config.php: Smart Links routes + menu group, public /l/{slug},
SmartlinksIntegration services, smartlinks_* parameters (legacy
utm_manager_* keys still readable), version 0.18.0. The 0.17.0
placeholder /s/marketing-program-utm-taxonomies is replaced by the
real /s/utm-taxonomies.
- Translations merged (en_US) and added (fr_FR); Tests/ + phpunit moved
in; readme documents both domains and the 0.18.0 merge history.
Verified live: menus, both config tabs, both lists + forms, program
pages, public redirect with taxonomy UTM values, host + unknown-slug
404s, 90/90 unit tests, full php -l, all ini catalogs parse.
Rename the Plan bundle to Program across config, routes, menus, and
controllers (Plan -> Initiative), bump version to 0.16.0, and introduce
new audience and UTM taxonomy routes and permissions to support the
expanded Programs feature set.
- Introduced migration Version_0_13_0 to update task schema:
- Changed start_date and end_date to DATE type, truncating time.
- Added new columns: task_kind, definition_of_done, planned_work.
- Removed parent_id and its index, replacing with a dependency graph.
- Created new tables: plan_task_dependencies and plan_task_raci, including a join table for stakeholders.
- Updated Version_0_4_0 migration to remove references to parent_id.
- Refactored TaskModel to return tasks as flat rows with dependencies and RACI assignments.
- Modified task table view to display tasks without hierarchical structure, adding badges for milestones and phases.
- Enhanced task form to include dependencies and RACI roles, with appropriate macros for rendering.
- Updated task list view to reflect new task structure and display status based on task kind.
- Added new validation constraints for task dependencies and dates, ensuring no cycles or self-references.
- Removed obsolete ValidTaskParent validation as parent-child relationships are no longer supported.
- Updated translations to reflect changes in task management and new fields.
- Revised documentation to describe new task handling and features.
- Implemented TargetType form for managing target details including name, type, priority, stages, estimated size, profile criteria, pain points, value proposition, and preferred channels.
- Created migration scripts for adding type and priority columns to plan objectives and tasks.
- Added migration for creating plan targets and plan target stages tables, including foreign key constraints.
- Introduced stakeholder management with forms and views for creating, editing, and listing stakeholders.
- Enhanced UI with read more functionality for long text descriptions and filtering options in plan tab tables.